Brake Job Execution Matrix

⚠️ SECURITY FIRST: Jack stands on reinforced pinch welds. Keep hydraulic jack slightly raised under axle as fail-safe.

Tools & Hardware

ToolPurpose
YATO YT-1714Small bolts (12 - 32 Nm)
Big Torque WrenchBracket & Wheels (80 - 180 Nm)
PASSK 20-Li C4 ImpactWheel removal
Anti-slip ChocksFront wheels (both directions)
Vacuum / Brushes / MalletCleaning and handling

Chemicals Matrix

ProductTarget
MA PROFESSIONALCaliper slider pins ONLY (Hazelnut size)
Wurth HTPads, clips, star-wheel, handbrake hinge, hub face
K2 PROLOK T245Main bracket bolts (1 drop per bolt)
PTFE SprejHandbrake cable sleeve, return spring
Coyote Biela lítiováDoor hinges/latches
Acetone-Free CleanerGeneral decontamination

Execution Phases

1. Preparation

2. Disassembly 🎬 [00:00:26]

3. Pin Overhaul🎬 [00:19:07]

4. Pivot Lubrication🎬 [00:24:25]

4.1 Shoe Adjustment

5. Bracket Securing🎬 [00:30:41]

6. Pad Installation🎬 [00:39:41]

7. Pre-Ground Testing

8. Bedding & STK Prep

Misc Tasks